Decking · Autumn
Decking in Autumn: What an Ayrshire Winter Does to a Deck
By October most decks are finished for the year. The furniture goes away and the boards are left to face months of rain. It is a good time to look honestly at how yours is holding up, and a good time to plan a new one.
Where decks fail
The two most common decking failures in Ayrshire are subframe rot, from poor ventilation and moisture contact, and heave. Heave is the deck lifting or sagging because ground spikes have moved through frost action in clay soils. John uses concrete pad footings or screw-pile foundations instead of spikes wherever the ground calls for it.
Timber or composite
In west coast conditions a timber deck needs cleaning, treating and oiling every year. Most homeowners do it once or twice and then stop, and within five to eight years the boards are grey, cracking and starting to rot. Composite boards do not need treating and do not rot or split. Composite is John’s default recommendation for most Ayrshire gardens, but he will not push it if you want real timber and are committed to maintaining it.
Planning a new deck
- Ground assessment, drainage check and a written quote with the full materials spec
- Steps, balustrades and handrails where they are needed
- Planning and building regulations checked for every raised deck
- A realistic timeline given with the quote
- All waste removed and the site left clean
Get A Free QuoteMore about decking →
JM All Trades Ayrshire Ltd · Serving Ayr, Kilmarnock, Prestwick, Patna, Drongan & all of Ayrshire · 07990 226785